LKB undertook
Design Phases I-VI, including an EPP and preliminary design of the
bridge, for the replacement of the pre-existing 10-span, 390-foot-long
structure with a pre-stressed concrete continuous beam structure. The
design included highway realignment, drainage improvements, MPT, and
construction staging plans.
The bridge connects the Villages of North Haven and Sag Harbor, the
latter of which is situated in both the Town of Southampton and the Town
of East Hampton. Consequently, LKB’s responsibilities included public
outreach and coordination with two villages, two towns, two historic
societies, and Suffolk County. Major design considerations included
replacement of the existing bridge with a new bridge at the same
location, aesthetics of the new structure, and staged bridge
construction to allow through traffic over the existing structure during
construction.
The newly-constructed bridge replaces a 64-year-old deteriorated
structure of surpassing historic grace and elegance. The new bridge
looks much like the old, with the added benefit of modern construction
techniques. This was of the utmost importance to local communities,
which shared a nostalgic attachment to the bridge. The “grass roots”
public involvement process helped residents claim the new bridge as
their own. With sensitive engineering design, advanced display aids,
intelligent traffic management, and more, LKB is proud to have played
its part in this local success story. |
|
 |
 |

Location
Sag Harbor/North Haven, NY
Client
New York State Department of Transportation, Region 10
Project Term
1993-2001
Construction Cost
$10M
Services
Bridge Design
Drainage Design
DTM
Guiderail and Impact Attenuators
Highway Design
MPT Plans
Pavement Striping & Channelization
Structural Investigations/Studies
Topographic & Design Survey
Utilities & ROW Survey
Waterfront Structure Design
Nominations
Nominated by NYSDOT Region 10 for
the 2001 NYSDOT Context Sensitive Design Award
 |
 |
|